Ernst Engineering performed HEC-RAS hydraulic analysis to assess the impacts of a proposed vehicular bridge crossing of the Supply Ditch irrigation canal.
The existing downstream control structure and bridge were modeled within the study reach to accurately depict channel backwater effects.